Industrial Biomass Boiler

Description: Renovation of an existing industrial structure that utilized a mixture of both new and existing members from the 1st to the 6th levels and then transitioned to all new steel from there to the 13th level.  1300 tons of existing and new steel was modeled for the process. Coordination with existing conditions and Boiler components relied heavily on BIM.

Customer: Steel Fabricator

ABSI Role:  Steel Detailer