National Infantry Museum

Description: 1500 tons of steel detailing performed.  This building was outfitted with a large dome that was lifted in one piece during the topping out of the structure.  It also included special structural accommodations to hold a Bradley vehicle.  The building was very large and featured many unique elements including an IMAX theatre. Zero change orders were issued by ABSI on this project.  We believe this demonstrates our resolve to do everything we can to stand by our fees and not engage in the gamesmanship that is so prevalent in the construction field.  This project is featured to demonstrate the capabilities of our company on time sensitive, high profile projects.

Customer : Steel Fabricator

ABSI Role : Steel Detailer